Paradise Pond will be partially drawn down on Tuesday July 7th for two days (initially about 2.5 feet) to repair the flash boards. On the third day the Pond stage will be raised to about 12" below normal pool for the next 4 weeks while contractors repair the dam. River flow will pass through the sluice gate during construction.